Mayo Power project upgrade - transmission to link two Yukon Electric Transmission Systems
Why put this in AED? The interconnection of Whitehorse to Dawson, Yukon means that roughly 250 plus miles separates an interconnection between Dawson and Delta Junction, Alaska. On the southern end of Yukon's power grid, a link from Carcross Jct to Skagway's Goat Lake project is roughly 50 miles. So, an interconnection of Southeast Alaska through Yukon to the Railbelt isn't that far fetched. Nothing is understood to be planned by either Yukon Energy nor the Alaska Energy Authority, however an interconnection between the Alaska Railbelt and Southeast isn't insurmountable, nor farfetched either.